Dr. Deepankar Sharma

Dr. Deepankar Sharma

Designation ADDL DIRECTOR
Faculty Type Regular
Qualification

M.Sc. Phd

Publication

International Journal

  • Stochastic behavior of ATM system with Head-of-line repair, 2011, Vol.3, No.2.
  • Performance analysis for summer air conditioner with priority repairs, 2018, vol. 7, no. 4
  • Availability evaluation of a standby redundant complex system under pre-emptive resume repair, 2006, vol.2, no.1
  • Operational availability of a parallel transit fuel system in petrol engine under head-of-line repair, 2007, vol.1, no.2
  • Behaviour analysis of automated teller machine (ATM),2007, vol.14, no.2
  • Stochastic behavior of sugar plant with 2-out-of-3:F boilers and pre-emptive resume repair, 2009, vol.5, no.2.
  • Reliability Forecast for Tele-communication System, 2010, vol.1, no.9.
  • Cost Estimation for ATM with Pre-emptive Resume Repair, 2010, vol.1, no.9
  • A Failure-Waiting-Repair Model of a Standby Redundant Complex System, 2011, vol.2, no.1.
  • Stochastic Behavior of a Computer Network System, 2011, vol.2, no.2.
  • Reliability Analysis for a Summer Air Conditioning System with the Aid of Boolean Function Expansion Algorithm, 2011, vol.2, no.2.
  • Reliability Assessment for a Network having Standby Redundant Unit with Waiting in Repair, 2011, vol.2, no.2.
  • Performance Measures of a Multi-Evaporator Type Compressor with Standby Expansion Valve, 2011, vol.2, no.2.
  • Reliability estimation of summer air conditioner with priority repairs, 2011, vol.1, no.1.
  • Reliability Analysis for Rolling Mills Using Algebra of Logics, 2014, vol.5, no.3.
  • Consistency of a Two-Unit Parallel Redundant System Working in Three Different Weather Conditions, 2014, vol.5, no.4.
  • Stochastic Behavior of a Compound Redundant Rolling System, 2014, vol.5, no.6.
  • Stochastic Behavior of a Specific Gas Separator for Reliability Measures by Introducing Algebra of Logics, 2017, vol.7, no.9.

National Journal
  • Cost analysis availability and MTTF of a complex system with the concept of waiting and human error, 2002, vol.21, no.2.
  • Computation of Various Reliability Parameters of a Summer Air Conditioning System by Using Boolean Function Expansion Algorithm, 2010, vol.35.
  • Measurement of reliability parameters for solar (PV) system by employing Boolean function technique, 2010, vol.2, no.2.
  • Reliability and MTTF evaluation of telecommunication system, 2005, vol.2
  • Availability Analysis for Summer Air Conditioner with Pre-emptive Resume Repair, 2010, vol.35.
  • Cost Analysis for a Nuclear Power Plant with Standby Redundant Reactor Vessel, 2010, vol.2.
  • Estimation of reliability parameters for telecommunication system, 2005, vol.25.
  • Reliability Assessment of a Four Cylinder Diesel Engine with Standby Fuel Backup through Perfect Switching Over Device, 2011, vol.3.
  • Reliability measures for a system having two-dissimilar cold standby units with random check and priority repair, 2010, vol.2.
  • Availability estimation of urea manufacturing fertilizer plant with imperfect switching and environmental failure, 2005, vol.29.
  • Profit Estimation for a Gas Separator Plant under Pre-Emptive, 2011, vol.3.
  • ESTIMATION OF AVAILABILITY AND COST FOR COMPLEX SYSTEM WORKING IN DIFFERENT CLIMATES, 2017, vol.36.